Calando
A logbook for your GLP-1 shots

Your GLP-1 shot and weight log,
at your own pace.

A pace that isn't too fast, and a way to see whether you're on track. When the medication pauses, the record carries on.

Get it onGoogle Play Coming soonApp Store

Start right away. No account. Your health records and photos are never sent to our servers.

My progress chart: the pace range the user set (pale green band), the 7-day average weight line, injection days and the estimated remaining amount
The green band is an example of a range the user set. The curves are not measurements: they are an estimated remaining amount (Plus) calculated from dose and half-life.
Pace range

Compare with the pace
you want

The pale green band on the chart is the weight-loss pace range you set. Follow your 7-day average alongside it and see how it compares with the pace you want. You can change the range at any time.

  • A 7-day average, so one day's ups and downs don't throw you
  • If you lose faster than the range you set, a note under the chart says so
  • Your injection days are marked on the same chart
At a glance: your recent days of meals, water, caffeine, alcohol, workouts, gut rhythm and symptoms as bars by day
At a glance · Plus

Your recent records at a glance:
what you logged and what's missing

Meals, water, caffeine, alcohol, workouts, gut rhythm and symptoms: your recent days on one card. Without opening each day, you can see what you logged on which day and what is missing.

While the medication is paused

When the medication pauses,
the record carries on

A procedure, a check-up, or the end of a course: sometimes the medication stops. That's when it matters most. Calando shows how your weight moves from the day you paused.

  • Change since the low, the high and the pause, in one line
  • Notice early if it starts to climb again
  • No shots, but meals, workouts and weight carry on
Your journey

The day you started and today,
side by side

Compare with an avatar drawn from your height and weight, or with your own photos. Photos are never sent to our servers.

Photos · Face

Face photo at the start (example)
Start · Feb 7 (example)
Face photo now (example)
Now · Sep 12 (example)

Photos · Full body

Full-body photo at the start (example)
Start · Feb 7 (example)
Full-body photo now (example)
Now · Sep 12 (example)

Example photos, AI-generated.

Your journey: the avatar at the start and now, BMI 29.4 and 26.5

Avatar

Not ready for photos? That's fine. An avatar drawn from just your height and weight shows your shape on the day you started and today.

BMI 29.4 → 26.5 (example)

A standard figure for your BMI range. It doesn't show your actual body shape or composition.

Everyday logging takes seconds

Log meals, water, caffeine, alcohol, workouts and how you feel from the Today screen. The Medication screen shows your next shot and the next site.

Today screen: My progress, next injection, meals, and water, caffeine and alcohol
Today Your usual drinks as one-tap buttons
Medication screen: days to the next injection, next dose and site
Medication Reminders and site rotation

Your health records never reach our servers

Health records are as personal as information gets. So we decided not to take them.

No account

No sign-up and no login. Install it and start.

Nothing sent to us

Your shots, weight, meals, photos and symptoms are never sent to us. There is no server to receive them.

Take it with you anytime

Backup files and CSV export let you move and keep your records.

All that leaves your phone is usage statistics and crash reports (tied to a random per-install identifier, never your health records or photos) and subscription purchase information. Usage statistics and crash reports can be turned off in Settings. If you use iCloud or Google device backup, the operating system may include the app's data in your own account's backup. The details are in the Privacy Policy.

Recording is always free

Every kind of record, reminders and backup are free. The features that read your records back come with Calando Plus.

Free

  • Shots, weight, meals, drinks, workouts and how you feel
  • The Today screen and your timeline
  • Injection reminders and site rotation
  • Backup, restore and CSV export
  • Apple Health and Health Connect

Calando Plus

  • Weight pattern report
  • At a glance: a summary of your recent records
  • Estimated remaining-amount curve (calculated from dose and half-life, not a measurement)
  • Weekly review
  • Body-fat curve
Free trial
One month, for first-time subscribers only. Cancel before it ends and you won't be charged.
Price
On Google Play: US$1.99 a month or US$9.99 a year in the US, ₩3,300 a month or ₩17,000 a year in Korea. Other countries see local prices in the store. App Store prices will show in the store at launch.
Renewal
Renews automatically every month or year until you cancel. Change or cancel it in your store account.
Calando is not a medical device. It helps you organise and look back on your records; it does not diagnose or treat anything. Talk to your doctor about your dose and any decision about your treatment.

Start using Calando

No account needed, and recording is always free.

Get it onGoogle Play Coming soonApp Store

Android: available on Google Play · iPhone: App Store release in preparation